FAQs: Frequently Asked Questions

Do contractors have to register with the city of Crowley?

Yes, all electrical, plumbing, and mechanical contractors must register with the city of Crowley to do work in Crowley. The annual registration fee for mechanical contractor masters is $100. Re-registration (if registered the prior year) is $50. There is no registration fee for plumbing and electrical contractors.

How is my property zoned?

Each parcel of land within the corporate limits of the city of Crowley is situated within a particular zoned district. The official zoning map is available for inspection in the Community Development Department at City Hall. However, a link has been provided for your viewing.

How long does it take to get a permit?

Some permits are available at the time the permit is filed and fees are paid. However, new construction or remodeling may take 2-3 working days to be reviewed. Commercial permits may take up to 10 working days for review.

If I have an existing electric/gas water heater in or accessible from the garage, and need to replace it, must I get a permit and must I raise it 18 inches above the floor?

Yes, codes have been changed to prevent accidents. The water heater thermostat energizes the heating element when the water temperatures within the tank fall below a certain selected level. At the instant, the thermostat activates a spark result. This spark is a source of ignition for flammable or combustible vapors (i.e., gasoline) that may have accumulated along the floor of the garage. The 18-inch elevation is intended to keep ignition sources above these vapors that are heavier than air and settle to the garage floor. The permit is to ensure the water heater has been installed properly. 

Plumbing Permit Application

Is a permit required for a garage sale, fence or accessory building?

Yes, regulations limit the number of garage sales allowed each year. The location, height, and sizes of fences and accessory buildings are also regulated.

Building Permit Application

What information will I need when requesting a building permit?

Complete the application, including contractor's name and address, owner's name and address, project address, and drawings. Applications are submitted to the Building Official for review and/or approval. Once approved, permits are issued. All projects are filed by address.

Building Permit Application

When is an inspection required?

Most of the permits issued by the City of Crowley require inspection. The type of permit issued determines the type of inspection needed. The permit clerk issuing the permit will instruct you to call for inspections if one is required.